Difference between revisions of "AC and DC power monitoring"

From exigoWiki
Jump to navigation Jump to search
Line 8: Line 8:
 
== Database Wizard ==
 
== Database Wizard ==
 
When creating a new database using the wizard both the AC and the DC power monitoring is by default turned off:
 
When creating a new database using the wizard both the AC and the DC power monitoring is by default turned off:
 
+
[[File:AC DC power monitoring 1.JPG|thumb|left|500px|EMT Wizard]]
 +
<br style="clear:both;" />
  
  

Revision as of 08:53, 6 December 2016

ESC1 power inputs

This article explains how to enable monitoring for bot AC and DC power input.
The Exigo ESC1 and the ENA2200 can be connected to a primary AC power source and a secondary DC power source.
Switch-over between these power supplies is seamless and controlled by the units themselves.
The power input monitoring can be individually turned on or off.

Database Wizard

When creating a new database using the wizard both the AC and the DC power monitoring is by default turned off:

EMT Wizard