Difference between revisions of "Panel Lamp Test"
Jump to navigation
Jump to search
(Created page with "Panel Lamp Test is used to check that all LEDs work properly.") |
(→Configuration) |
||
(20 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
− | Panel Lamp Test is used to check that all LEDs work properly. | + | '''Panel Lamp Test''' is used to check that all LEDs work properly on an access panel. |
+ | |||
+ | == Configuration == | ||
+ | |||
+ | * Drag-and-drop: '''Panel Lamp Test''' to: | ||
+ | '''[[:Category:Access Panels|Access Panels]]''' > '''Programmable Keys''' > '''p1-px''' > '''press_action/release_action''' | ||
+ | |||
+ | or | ||
+ | |||
+ | '''[[:Category:Access Panels|Access Panels]]''' > '''[[Control Inputs]]''' > '''CI_1-CI_6''' -> '''on_action/off_action''' | ||
+ | |||
+ | [[File:Panel_Lamp_Test_1.png|thumb|left|600px|Panel Lamp Test]] | ||
+ | <br style="clear:both;" /> | ||
+ | |||
+ | '''<u>Activation</u>''' <br> | ||
+ | Start, Stop or Toggle the broadcast. | ||
+ | |||
+ | '''<u>Timeout</u>''' <br> | ||
+ | The amount of time in seconds the broadcast will be active before it switches off. <br> | ||
+ | Default = 10 seconds. | ||
+ | |||
+ | == System Status combined with Panel Lamp Test == | ||
+ | It is possible to combine System Status with Panel Lamp Test on the same DAK. <br> | ||
+ | More information can be found [[System_Status#System_Status_combined_with_Panel_Lamp_Test | here]]. | ||
+ | |||
+ | |||
+ | |||
+ | [[Category:Exigo features]] | ||
+ | [[Category:Input Actions]] |
Latest revision as of 10:38, 18 October 2018
Panel Lamp Test is used to check that all LEDs work properly on an access panel.
Configuration
- Drag-and-drop: Panel Lamp Test to:
Access Panels > Programmable Keys > p1-px > press_action/release_action
or
Access Panels > Control Inputs > CI_1-CI_6 -> on_action/off_action
Activation
Start, Stop or Toggle the broadcast.
Timeout
The amount of time in seconds the broadcast will be active before it switches off.
Default = 10 seconds.
System Status combined with Panel Lamp Test
It is possible to combine System Status with Panel Lamp Test on the same DAK.
More information can be found here.