Primary System Controller Upgrade

From exigoWiki
Revision as of 08:28, 24 June 2016 by Gsorensen (talk | contribs) (Backup customer data)
Jump to navigation Jump to search

This article describes how to upgrade the software on the Primary System Controller part of the ESC1 - Exigo System Controller. The Primary system Controller (PSC) is also called:

  • Domain Controller
  • AMC-IP Board

Backup customer data

Configuration data might get lost after the upgrade.

The customer data MUST be backed up by doing a Get operation from Exigo Management Tool before the upgrade is performed.