Difference between revisions of "Primary System Controller Upgrade"

From exigoWiki
Jump to navigation Jump to search
(Backup customer data)
Line 8: Line 8:
  
 
The customer data MUST be backed up by doing a '''Get''' operation from '''Exigo Management Tool''' before the upgrade is performed.
 
The customer data MUST be backed up by doing a '''Get''' operation from '''Exigo Management Tool''' before the upgrade is performed.
 +
 +
 +
==Software Upgrade==
 +
The software upgrade is done in two steps:
 +
 +
* Installing the '''Board Support Package''' (bsp)
 +
* Upgrading the '''alphasys'''
 +
 +
 +
 +
[[Category:How-To]]

Revision as of 08:32, 24 June 2016

This article describes how to upgrade the software on the Primary System Controller part of the ESC1 - Exigo System Controller. The Primary system Controller (PSC) is also called:

  • Domain Controller
  • AMC-IP Board

Backup customer data

Configuration data might get lost after the upgrade.

The customer data MUST be backed up by doing a Get operation from Exigo Management Tool before the upgrade is performed.


Software Upgrade

The software upgrade is done in two steps:

  • Installing the Board Support Package (bsp)
  • Upgrading the alphasys